
Stories on YoCharge
PPI License For A Charging App Wallet: RBI Rules, Closed vs Semi-Closed, And When You Need One
💡 PPI License For Charging Wallets: Key Highlights Single-network wallets are usually outside RBI’s net: a balance that can only buy your own charging sessions is a closed system PPI, which the RBI does not treat as a payment system […]
Fleet Energy Management Software: What The Energy Layer Above Your Depot Chargers Has To Do
💡 Fleet Energy Management Software: Key Highlights Four layers, one kW budget: fleet operations, charging management, the site energy system and the utility all act on the same grid connection. Most depot problems come from two of them setting limits […]
COCO Petrol Pump, CODO Or DODO: Who Owns, Runs And Bills The EV Charger
💡 COCO Petrol Pump vs CODO vs DODO: Key Highlights Fuel is symmetric across the three models; electricity is not. The power for a charger comes from the DISCOM, on a connection in someone’s name, and that one fact decides […]
CERT-In Guidelines For Charge Point Operators: Six-Hour Reporting, 180-Day Logs And What Actually Applies
💡 CERT-In Guidelines For CPOs: Key Highlights 6 hours: any of the listed cyber incidents must be reported to CERT-In within six hours of noticing it, or of being told about it. A partial first report is accepted. 180 days: […]
VAPT, ISO 27001 And SOC 2: The Security Evidence To Demand From Your Charging Software Vendor
💡 VAPT, ISO 27001 And SOC 2: Key Highlights Every charging-platform deal reaches the security questionnaire stage, and that is where a VAPT report, an ISO 27001 certificate and a SOC 2 report change hands. This guide is for the […]
Vertiport Charging Infrastructure: What eVTOL Turnarounds Demand From The Energy Side
💡 Vertiport Charging: Key Highlights 300 kW to 1 MW per aircraft: the peak DC charging range eVTOL manufacturers reported to the FAA-sponsored vertiport electrical study, which advises planning for 1 MW or more per site. Minutes, not half-hours: launch […]
Must-Have AI Integrations For Your EV Charging Software In 2026
💡 AI Integrations EV Charging Software: Key Highlights A mid-size charging network today generates hundreds of thousands of data points every week — session timestamps, energy consumption per connector, payment reconciliation records, charger health telemetry, driver behaviour patterns. That data […]
PCI DSS And EV Charging: What Card Payments At The Charger Scope In
💡 PCI DSS And EV Charging: Key Highlights PCI DSS v4.0.1 is the current standard (published June 2024); all requirements are now mandatory since 31 March 2025 A PCI-listed P2PE terminal encrypts card data at the reader and keeps it […]
Wayside Amenities And Highway EV Charging: Peak Days Set The Business Case
💡 Wayside Amenities: Key Highlights Highway EV chargers earn disproportionately on weekends, long weekends and festival days — the best ~50 days can deliver 35–40% of annual revenue while making up only 14% of the calendar. NHAI’s wayside amenity programme […]
Parking Management System And EV Charging: ANPR, Barriers, Validation And Who Bills The Driver
💡 Parking Management System And EV Charging: Key Highlights The charger is the guest system. The site’s parking management system already controls entry, exit and payment. Integration has four points: identity (plate, RFID or app), access (barrier and validations), billing […]
EV Charging Cable Standard India: What IS 19967:2026 Means For CPOs And Charger Buyers
💡 EV Charging Cable Standard India: Key Highlights IS 19967:2026 is a dedicated Indian Standard for EV charging cables, established by BIS on 14 October 2026 (World Standards Day). It covers flexible cables rated up to 1,100 V AC and […]
PM E-DRIVE Charging Station Scheme: 8,147 Chargers Approved For Rs 851 Crore
💡 PM E-DRIVE Charging Station Scheme: Summary The PM E-DRIVE charging station scheme now has a firm number behind it. A PIB backgrounder from the Ministry of Heavy Industries (MHI), dated 1 October 2026, says Rs 851 crore has been […]
Odisha EV Charging Tender: 170 PM E-DRIVE Sites, Bids Close 26 October
💡 Odisha EV Charging Tender: Key Highlights The State Transport Authority (STA), Odisha issued the Odisha EV charging tender on 1 October 2026 under Tender Reference No. 17486/TC. It invites charge point operators to supply, install, commission and run public […]
EV Charger Connectivity: M2M SIM Card Choices And What Takes A Site Offline
💡 M2M SIM Card And Charger Connectivity: Key Highlights India had 29,151 public EV charging stations installed as of December 2025 — 8,805 fast, 20,346 slow — per figures the Ministry of Heavy Industries tabled in the Lok Sabha. Nobody […]
EV Charging And Green Building Certification: What IGBC, GRIHA, LEED And ECSBC Require
💡 Green Building Certification And EV Charging: Key Highlights If you are a real estate developer, a commercial landlord, an architect or a facility and ESG manager, green building certification has quietly become the place where your EV charging decisions […]
Power Quality at EV Fast Charging Sites: Harmonics, Power Factor and Grid Compliance
DC fast chargers are large non-linear loads. Here is what poor power quality costs a charging site every month, and which limits actually bind.
NIS2 And EV Charging: What The EU Directive Requires Of Recharging Point Operators
💡 NIS2 And EV Charging: Key Highlights If your company manages and operates public recharging points anywhere in the EU or EEA, NIS2 is already your law: the compliance date was 18 October 2024, and the obligations attach to your […]
Open Access Power For EV Charging: Wheeling Charges, Duty And What A CPO Pays Per Unit
A charging network’s biggest cost is the unit rate. How wheeling charges, surcharges and state duty decide what a CPO actually pays per kWh.

















